| -To the left of the house is the indoor pool located - |
This building appears to be an indoor swimming pool, "is located in the Campo do Bugallo place in the Municipality of Oia (Pontevedra), and its promoter has been carried out without municipal license, so the appropriate charges were filed before the City Council on 12.12.2003 (SR 1705) and CPTOPV before the 01/02/2004, the latter as it was and is competent in such soils. Even lodged a complaint with the Prosecution on 30.06.2008 ...
It is located on land classified as "common undeveloped land" (Order 6), subsidiaries of existing Planning Standards Oia, now called "ordinary rural land protection" .
| |
| "And now with these trees is to hide all gaze |
And it was built throwing a lot "and face value" ... and a lot of "dereliction of duties" of those who were and are required to monitor and defend the planning, because it must define this action. Each other ... It
requested that construction start-to-a planning permission for minor works, the most picturesque, as of 05.09.2005 (SR 755), and therefore the effect LOUGA , and in which the type of work to do, is to "outer packaging" . That's the whole explanation ... providing, obviously, "Report describing the work and its features, construction and aesthetic dimensions, distances to the boundaries and lines of public roads; map of official cartography PXOU and Budget (in duplicate) with a breakdown of the items of the work. "
| |
| "That was the ...- 03.07.2004 |
on 23.06.2005, the former surveyor issued municipal technical report unfavorably ... and reflecting that "works that are to be developed are outer packaging with impaired holes in the facade settings, so that the works to make major works are considered" , therefore, to continue processing the case shall provide, upon request dated 06.27.2005 municipal (RS 942): 1). TECHNICAL PROJECT SIGNED BY competent technician and approved by professional bodies (for ducplicado), 2). Appointment of technical project managers, and 3). Deed. With that request, given a reprieve of 15 days to submit documents expressed, otherwise the file would be paralyzed, and archiving of all actions.
| |
| -... And so- 01/17/2004 |
16.08.2006 Again the now the municipal technical architect, re-issuing a new technical report, supposedly giving a new opportunity to the alleged offender ", which is said :
"Revised to documents filed with data neste concello 09/05/2005, and since that 06/27/2005 date by this district will be required to subsanación the documentation submitted; Report:
| |
| -Y ... he 06/12/2003 they were initiating constructive activities- |
1. What response is not received the required documentation, and considering the time elapsed since the same, if any the process file without further processing ". Y so by resolution of concejal Planning of 28.08.2006, remembers the filing of the proceedings. And curiously, 03.03.2008, re-arrange the file again, supposedly notified by letter of 5.3.2008 (RS 458) ... And, without having taken action, both the initial suspension, as required incoacción the record of replacing the breached planning law. And that is, fully completed and without the City, even have initiated the corresponding record replacement of legality and the usual penalty ... And the aplu what?.